As part of its investment and development plan, Ediltunnel is preparing in-house the design and construction of new machines equipped with modular hydraulic clamps for pushing and pulling pipes in and from the ground.

The new Ediltunnel machines can be used among the rest:

  • for the construction of new gas pipelines with type Direct-Pipe method
  • for the rapid removal of gas pipelines to be decommissioned and replaced