MICROTUNNEL – Core Business –

  • Herrenknecht AVN 2000 ext 2200 e 2400 (2 units)
  • ET DN 2000 ext 2200 e 2400
  • Herrenknecht AVN 1800 ext 2000 e 2400
  • Herrenknecht AVN 1600 ext 1800 e 2000

 TOC

  • Hutte 150 t
  • EGT 90 t
  • EGT 30 t

AUGER BORING MACHINES

  • Ediltunnel DN 250:1600

OTHER EQUIPMENT

  • Push-Module and Back-Up for Segmental-Lining DN 2000 (steel segments) and DN 2400 (reinforced concrete segments)
  • Air-Lock for interventions in hyperbaric conditions
  • Curve guidance systems for MT (VMT)
  • Hydraulic brakes for MT
  • Separation plants
  • Centrifuges and filter presses
  • Clogging system
  • Systems for launching pipelines in Micro Tunnels
  • Drilled pile system D 600/1000 mm (for the construction of starting pits)
  • Generators, cranes, excavators, transport vehicles, etc.