MICROTUNNEL – Core Business –
- Herrenknecht AVN 2000 ext 2200 e 2400 (2 units)
- ET DN 2000 ext 2200 e 2400
- Herrenknecht AVN 1800 ext 2000 e 2400
- Herrenknecht AVN 1600 ext 1800 e 2000
TOC
- Hutte 150 t
- EGT 90 t
- EGT 30 t
AUGER BORING MACHINES
- Ediltunnel DN 250:1600
OTHER EQUIPMENT
- Push-Module and Back-Up for Segmental-Lining DN 2000 (steel segments) and DN 2400 (reinforced concrete segments)
- Air-Lock for interventions in hyperbaric conditions
- Curve guidance systems for MT (VMT)
- Hydraulic brakes for MT
- Separation plants
- Centrifuges and filter presses
- Clogging system
- Systems for launching pipelines in Micro Tunnels
- Drilled pile system D 600/1000 mm (for the construction of starting pits)
- Generators, cranes, excavators, transport vehicles, etc.